Projects

Water Distribution and Treatment

Design of water distribution and treatment is a large component of our business. Ensuring that these facilities are constructed in conformance to plans and specifications, and completed on time and on budget, is critical to the success of the project. We have provided construction inspection and administration / management services for projects designed by our staff and for projects designed by others. We have also provided construction certification for health department approvals for contractors and institutional clients.
Lloyd Aquastore Tank

  • Poughkeepsies’ Water Treatment Facility Improvements – Poughkeepsie, NY
    • Detailed evaluation of Water Treatment Facility and design for a 20% expansion of water treatment facilities.
    • Detailed Evaluation of Water Treatment and Distribution System and design of Ozone and Centrifuge water treatment improvements.
    • Evaluation and design work completed as a team project with CH2M HILL. Design support services provided during construction of the expansion and water treatment improvements.
    • Support for funding of projects utilizing Drinking Water State Revolving Loan Funds (DWSRF).
  • Town of Wappinger/Water Main Loops and Filtration Improvements – Wappingers Falls, NY
    • Provide design and construction administration and specifications services for approximately 7,900’ of 8” ductile iron and PVC water main.
    • Provide design and construction administration and specifications services for installation of cartridge filtration improvements, including new building, cartridge filtration units, piping connections, instrumentation and control improvements and well pump upgrades.
    • Administration of NYSDOT permits; coordination with DCDPW, NYSDOH, and Town of Wappinger.
  • Town of Wappinger/NYC DEP Extension, Phase 1 – Wappingers Falls, NY
    • Provide design, specifications, and construction administration services for approximately 4 miles of 12” ductile iron water main.
    • Prepared Map, Plan and Report, Long Form EAF and Water Supply Application. Project involved directional drilled wetlands, road and power line crossings.
    • Administration of NYSDOT permits, coordination with DCDPW, NYSDOH, and Town of Wappinger.
    • Ensured approval of completed work within accelerated schedule.
  • Hopewell Hamlet Water System – East Fishkill, NY
    • Design of treatment storage and distribution system. Water source consisted of four wells with 143,000 gallon storage tank, water supply building and 9,400 ft. of water distribution main with service connections.
    • Map, Plan and Report, Long Form EAF and Water Supply Application for system serving 40 commercial properties.
  • Springwood Village Water Line Replacement – Hyde Park, NY
    • Design of replacement water main for 3,700 lineal feet of existing A/C water main
    • Performed survey, prepared plans and specifications for water distribution main, valves, hydrants and service reconnections for existing areas within the Hyde Park water system
  • Highland Water District – Northern Light Industrial Water Extension - Highland, NY
    • Provide design and construction administration for water distribution system and new storage tank for extension of water district
    • Project involved the installation of 6000’ of 12”, 10” and 8” pipe
    • Modification to an existing pump station
    • Installation of a 259,000 gallon, glass lined storage tank, control building with re-chlorination and telemetry to the existing SCADA system
    • Coordination with NYSDOT major project division, Town of Lloyd Water Department, individual property owners and a UCDOH was conducted
  • Stockport Water District No. 2 – Stockport, NY
    • Location and installation of two supplemental wells
    • New 420 GPM Trident Microfloc filtration water treatment
    • One million gallon storage tank
    • Distribution system extensions to provide comprehensive water system improvements for the town of Stockport
    • Individual meter for all customers
    • Designed, administered and coordinated General, Electrical, Plumbing and HVAC contracts
  • Town of Greenport Water Main Replacement – Greenport, NY
    • Performed design and construction administration for 15,000 ft. of water distribution main replacement
    • Project involved decommissioning of existing mains, installation of new mains and connection of existing services to the new main
    • Coordination with the Town of Greenport Water Department and Columbia County Department of Health for temporary shut downs and approval to provide service to properties from the new main was required
  • Greenbush Water District Formation and Water Main Extension – Hyde Park, NY
    • Design and contract administration for a water main extension to service the Greenbush District
    • Performed water distribution modeling to size water mains
    • Included 19,000 feet of 8” – 12” water main, booster pump station, meter pit with backflow preventer, valves, hydrants and services
    • Included service extensions to individual homes
    • Coordination with NYSDOT, Town of Poughkeepsie Water Department, individual property owners and DCDOH was conducted
  • Bard College Water Treatment Facility – Annandale-on-Hudson, NY
    • Conversion of existing water filtration process from conventional filtration to a micro-filtration process, with control upgrades.
    • Design of a 288,000 gallon water storage tank with 850 linear feet of 8” ductile iron water line connection