Projects

Recreation Projects

Our municipal recreation project experience ranges from a splash pool for the Village of Millerton to master planning, design, public bidding and construction administration for the many varied recreation facilities of the Town of East Fishkill.

Our direct experience in park and recreation projects is demonstrated in the project descriptions that follow:

EF Rec Baseball Field
  • RECREATION MASTER PLAN AND IMPLEMENTATION – East Fishkill, NY
    • Preparation of the Town Recreation Master Plan (MP) involved an in-depth analysis of the existing facilities and complete project management
    • Overall site development plan
    • Recreation area pavilion performance stage
    • Concession stand & handicapped restrooms
    • Design of hiking trails with lighting
    • Tennis court upgrade
    • Floating swim dock/swimming lanes
    • Upgrades & expansions on football, baseball, & soccer & basketball fields
    • Inline skateboard park
    • Roller blade hockey area
    • Expansion & upgrade of picnic areas
    • Complete survey and topographic layout of entire recreation area
    • Irrigation systems, lighting, fencing
    • Parking lot reconfigurations with drainage & markings.
  • RED HOOK CENTRAL SCHOOL DISTRICT- Red Hook, NY
    • Project consisted of design and construction document preparation for a new 6 lane synthetic running track, 3 soccer and field hockey practice fields, 2 competition fields for soccer and field hockey, along with fencing, score boards and bleachers to accommodate 500 viewers.
    • Full field underground irrigation system and water supply was also designed and installed for three game fields.
  • DOVER UNION FREE SCHOOL DISTRICT – Dover, NY
    • Project consisted of design and construction document preparation for a new running track, grandstands, press box and concession stand.
    • The school gymnasium was also rehabilitated under this project to construct a new ceiling and lighting system.
  • PINEWOODS PARK – Hyde Park, NY
    • Responsible for the design and construction document preparation for the restoration of the tennis and basketball courts for an existing park.
  • TOWN SKATE PARK – Hyde Park, NY
    • Design of a new 75,000 square foot skate park.
    • Town Soccer Fields- Design of irrigation system for upgraded fields.
  • TOWN OF STOCKPORT – Stockport, NY
    • Provided site, architectural, structural, mechanical and electrical design and construction administration for a new 500,000 GPD water treatment filtration plant
  • DOVER UNION FREE SCHOOL DISTRICT – Dover Plains, NY
    • Engineer of Record for all engineering review/maintenance/upkeep of utilities for the district on an as-needed basis
    • Completed study/design and execution of “Five Year Capital Facilities Plan” for the entire district, including building, HVAC and architectural upgrades
    • Completed “2005 Building Conditions Survey” including inspection and evaluation of all facilities every 5 years
  • CITY OF POUGHKEEPSIE WATER TREATMENT FACILITY EXPANSION – Poughkeepsie, NY
    • Created a space utilization plan for an 8,000 sf water treatment facility
    • Created architectural construction documents for full renovation and subsequent expansion of offices, laboratories and chemical building.